Upgraded electrical system, new switch gear and electrical panels, Bureau of Indian Affairs, Riverside, CA. Project was a competitive bid. This project involved a number of trades and required very little roofing. The bulk of the work was replacing electrical panels and a switch gear in the cafeteria of the school. To do so underground were required to be upgraded. The project execution occurred during the student’s winter break because that was the only time that was acceptable by the school to have the cafeteria non-operational. We had to phase work to ensure everything was completed prior to the students returning from break. We finished the work on schedule with no impact to the students or school and on budget. Longhorn Electric was our only subcontractor on this project.